Uptime calculator

An SLA percentage is a downtime budget. Select a target to see what it allows per day, month, quarter, and year, without signing up.

Allowed downtime for the chosen availability target
PeriodAllowed downtime
per day1 min 26 s
per week10 min 5 s
per month (30 d)43 min 12 s
per quarter (91 d)2 h 11 min
per year (365 d)8 h 45 min

At 99.9%, one 43-minute incident uses a full month’s budget.

How to read the number

  • The budget is spent in confirmed windows. A quarter at 99.925% gross means 97 minutes of measured downtime across 131,040 minutes. The sample SLA report walks through that math.
  • Boundaries decide the number. A window from the quorum confirmation to confirmed recovery is defensible, and a window rounded to minutes is not. That is why Perstat floors availability and keeps real boundaries.
  • Announced maintenance should not spend the budget. Announced windows are excluded on their real boundaries and stay visible on the record.

Perstat monitors the target and keeps the record that shows whether you met it. Take the tour without signing up.